2015年5月9日星期六

When we work with the crane, what we should pay attention?

Job Case 1: the lifting steel rope hung, steel has been off the ground.

[What kind of danger]

1. Rope monofilament gap, resulting in wire rope breaking, hanging pieces fall injured workers.

2. When lifting a single long hanging pieces hanging pieces tilts, fall injured workers.

3. hanging pieces unbound, fell injured workers.

4. When hanging pieces just lifting, workers too close, was hanging pieces hit, fall.

5. useless leashes.

6 on the hook no anti-shedding device, hanging pieces off injured workers.

• pre-processing safety measures []

1. there is no breakage of wire rope.

2. When lifting long hanging pieces, preclude the use of 2-point lift, angle of 60 degrees between the wire rope.

3. neatly stacked lifting objects firmly tied.

4. off when using traction rope, who was some distance away from lifting.

5. Set up anti-fall device on the crane hook.

Job Scenario 2: positive with tower cranes unloading steel.

[What kind of danger]

1 with two wire rope lifting, reinforced in the lifting process is easy to fall.

2. Reinforcing materials shaking occurred, slipped beneath the injured worker to accept the goods.

3. Signal commander from the unloading platform too, hanging pieces fall resulting in signal commanding officers were injured.

4. No signal commanding officers.

[Safety measures, pre-processing]

1. Use the U-shaped hook, using four of the same length of wire rope lifting.

2. Reinforced lifting, loading dock workers to leave.

3. Signal commander certain distance away from the truck.


Job situation three: positive with tower cranes lifting steel beams.

[What kind of danger]

1. The hook is not set anti-slip setting off the rope, hanging pieces fall to cause an injury.

2. The presence of damaged wire rope, wire rope lifting process leading to fracture.

3. misaligned cable hanging position the center of gravity, leading to tilt hanging pieces occur in lifting process.

4. operators located between beams, when lifting result in entrapment.

5. Unused traction rope.

[Safety measures, pre-processing]

1. Install anti-fall device on a hook.

2. do not use a single wire breakage, Twisters broken rope.

3. Verify that the center of gravity, so that the hook is located above the center of gravity of the rear hanging, hung the rope.

4. When lifting hanging pieces, some distance away from the hanging pieces, using traction rope.


Job situation four: about lifting the steel material from the truck.

[What kind of danger]

1. lifting angle is too large (over 60 degrees), resulting in wire rope slide, hanging tilt down.

2. rope breakage of monofilament, lifting process fracture, leading to hanging pieces fall.

3. The upper edge of the hanging pieces in a sleeper, easily rolled, injury to operating personnel.

4. Signal commanding officers across the sleepers were directing, when hanging pieces tumble ass bounced sleeper hit.

5. Lifting from hanging pieces too close, workers are hanging pieces hit, dropping from the truck.

6. hook no anti-fall device, hanging pieces fall easily hurt.

[Safety measures, pre-processing]

1. ensure that the lifting angle within 60 °.

2. Use no damaged rope.

3 should be carried out after the first two ends of intermediate goods lifting, in order to ensure balance.

4. The use of traction rope hanging pieces off the ground, officers some distance away from the goods.

5. Install anti-fall device on the crane hook.


V. job: Ongoing lifting operations.

[What kind of danger]

1. hanging pieces below the signal conductor, hanging pieces fall resulting in personal injury work.

2. At the same time lifting the different shapes of materials, resulting in cable slide, hanging pieces fall, workers were injured.

3. Not used tow rope, hanging pieces result in a collision, shaking, wounding eventually fall.

[Safety measures, pre-processing]

1. The person can not stand underneath hanging pieces.

2. Different shapes are not simultaneously lifting materials.

3. Use the pull rope.

2015年5月7日星期四

Concrete residential life of at least 1000?

All types of housing network in the past, there is always the certainty of residential life of 30 years, 50 years to prove the absurd conclusions such as homeowners, and such remarks to now no one can reasonably argue. Indeed, the relevant norms have said very clearly: the ordinary civil construction is in accordance with 50-year design life.

House life expectancy is only 30 years, you buy a mortgage for 30 years is a bunch of garbage? House life expectancy is only 50 years, then, even now have, we can not leave the next generation too?

And it is interesting to note that the use of 50-year life of the house turned out to be 70 years, which adds to the mystery of residential life, so many people did not believe he lived in the house, plus the constant crack house to see outdoor pavement subsidence, more panic buyers together to denounce these "shabby."

However, the fact is that so?

Of course not, today, I can certainly tell you that the average life expectancy of concrete shear wall frame house is more than 300 years, the average life expectancy of multi-storey residential concrete frame is more than 1000, the average life expectancy concrete frame villa is more than 10,000 years. Shocked you!

First, the impact of the structural life of what?

Second, in addition to the structure of life, the life of the building itself, there are those problems?

Pick a major say. Own house decoration will change, not to mention.

Pipeline: 15 years to 50 years

Waterproof: 10 years to 15 years

Elevator: 15 years to 20 years

Wall decoration: 15 years to 20 years

These kind of things need to remind it. Basically the house after 98 years in charge of road are not buried in concrete inside, so easy maintenance, replacement is easy. Waterproof mainly roofing and facades, repair when you can handle, construction quality is not bad as long as a few years on the bad, the body maintenance payments basically enough. Elevator can be a major problem, but fortunately a lot cheaper now lift.

These maintenance problems currently houses the main problem is not the quality of the project, precisely, is really to be replaced when the owners are not necessarily the views of unity, not pushed everyone leak, all the electrical short circuit, appeared elevator accident to know to deal with. In fact, if the district consensus, each scrape together a few thousand pieces, bulk gold is not enough to solve the problem.


Calmly say, blow up the reconstruction of the house, but also 2000 per square meter.

Having said that, I do not know clearly no. Simply put your conclusion. House wooden structure can be used for hundreds of years, thousands of masonry everywhere, and reinforced concrete machinery commodity house almost unlimited life.

2015年5月5日星期二

Automatic Concrete Batching Plant What Are The Advantages?

Automatic concrete batching plant can in fact be referred to as a double tooth concrete mixers, concrete batching plant automatic advantage that what has it? Dong Chen mixing machinery equipment manufacturer specifically addressed to you, helping you to automatic concrete batching plants have a better understanding. Dong Chen is a professional mixing machinery equipment manufacturer, is also stirring the Central Plains region’s largest supplier of machinery and equipment; The dominant brands: Four Roll mixer, automatic concrete mixing station, three-roll crusher crusher product! Automatic concrete batching plant can be understood from the literal meaning of its most suitable for coke, coal mixing process in the actual crushing process also proved this point, automatic concrete batching plant is mainly used for coal, ore, coke and other materials crushing. Automatic concrete batching plant according to the actual production requirements, reference can be selected according to the amount of standard equipment hours of treatment; automatic concrete batching plant may also be referred to Spike automatic concrete batching plants, Branch constant production of coke crushing equipment can be divided into large and small, to meet the needs of different users.

If you want to consult fully automatic concrete batching plant price or performance-related mixing machinery equipment, through the introduction of advanced production technology, users pay a return visit, on issues related to mixing equipment in the crushing processes encountered, related summary, and then brought together the relevant engineering and technical personnel, the actual production process for the user issues analyzed and summarized, with the device itself structure, upgrading of equipment to meet the production needs of the user.

2015年4月15日星期三

BMW pressed into cakes by concrete truck mixer

When at 11:46 on February 11, a concrete truck mixer reaching the western end of the bridge disc Meizhou Meixian area, because of brake failure after hitting the car in front, and then push it to the front of the mixer, causing the car is rolling. Two people inside the car died.

2015年4月1日星期三

Screening Plant Selection Notes

Screening machine using the relative movement of granular materials with the screen surface, so that part of the particles through the sieve, sand, gravel, crushed stone and other materials by particle size into different levels of vibration screening machinery and equipment. Screening level depends on the particle surface sieve, sieve surface points grate plate mesh sieve and three. Grate material suitable for screening large particles, grate gap is under the screen size of 1.1 to 1.2 times, usually not less than 50 mm. Sieve plate formed by punching steel plate, holes were round, square or rectangular aperture is generally 10 to 80 mm, long service life, easy to plug, suitable for screening the medium particles. Compiled by a wire mesh screen or welded into the hole was a square, rectangular or elongated, common aperture is generally 6 to 85 mm, a long strip suitable for screening wet sieve materials, the advantages of the mesh screen is relatively effective area great.

1, A sieve of use: what materials screening? Screening or screening coal washed coal, ores, chemicals, food, etc., is graded or dehydration, referral, off mud.2, the material is wet or dry material sieve material (moisture content is the number), select sporty and tilt the screen surface large volume of water or when the material viscosity.3, the screening machine installation space dimensions: the screen surface width B and length L and height H4, selection and screening equipment classification: a fixed screen surface; 2, vibrating screen surface; 3, movement screen surface; 4, drum sieve surface; 5, other types of screen surface and so on.5. The maximum feed size, the expected size.6, the screening plant interface devices, and what follow-up equipment and size? The need for transport function, functional fabrics and iron functions.7, equipment handling capacity t / h.8, the installation forms: pedestal or hanging; motor is left or right mounting installation.9, the electronic control box and the control linkage installation sequence. Motor, electric control selection requirements.10. Other special requirements: the screen surface inclination, screens and other exterior paint colors

2015年3月10日星期二

Maintenance knowledge about concrete pump hydraulic system

Picture
Hanghzou truemax machienry & equipment co., ltd operating the concrete pump, a small concrete pump, concrete pump, concrete pumps for mining, fine aggregate concrete pumps, mortar pumps and other equipment for the maintenance of concrete has been very concerned about the topic of customers, here on this piece of concrete pump hydraulic system for users to answer.
Related maintenance and technical description of concrete pump hydraulic system:
First concrete pump hydraulic system before starting the work in the bottom of the precipitation water discharge tank. After every 50 hours of operation, open the drain valve at the bottom of the tank water. This time to pay special attention not to let the hydraulic oil flow. Also, the class detect minor hydraulic oil, the oil level should be at least 3/4 of the oil level gauge, otherwise filled; yellowish oil should be transparent, non-emulsified or turbidity, or should be replaced. The new hydraulic oil must be added to the manufacturer's recommended grade of hydraulic oil. The new machine after use 10,000 cubic meters ofconcrete machinery were the first oil change, after pumping 20,000 cubic meters per replacement.
Furthermore, every shift inspection cooler outside, if the dirt immediately wash, otherwise easily lead to oil overheating, leading to early hydraulic oil oxidation and damage the hydraulic system of the concrete pump. Check the vacuum table indicates per shift, should be in the green zone. Each shift Check the hydraulic system for leaks oil phenomenon, tank cover seal is loose, water intake. Per shift accumulator pressure checks whether the concrete pump manufacturer requirements, if not, please press.
In the start of the hydraulic system of conditions for concrete pump dry run. If the filter is in the red zone, said to replace the filter. If the filter indicator is in the green zone, the oil filter is working properly. Indicator has been in the yellow zone, indicating that part of the filter cartridge clogging; in the red area indicates that the oil filter cartridge is not properly filtered, the filter must be replaced. Under normal circumstances, the hydraulic oil filter cartridge must be replaced every 500h, and hydraulic return filter cartridge must be replaced every 1000h, and the first 200 hours of work necessary to replace the filter.

2015年3月7日星期六

A funny wedding


Just past the festival back, my colleagues are discussing to buy a house, a car and a blind date, these have a busy purpose is to get married. Wedding marriage ultimately inevitable.

Once in a lifetime wedding, who do not want to keep them coming back high and pulling boom? Recently, lifting machinery sessions of small partners frequently surprisingly open new "luxury car" the bride, money wayward radiant!


There is a excitely Wedding essential luxury cars, only we know, it is - Engineering Machinery Truck Crane
It is understood, February 24, New Year's sixth, Hangzhou Chunan County appeared Truemax cranes spectacular wedding team, a vehicle wash clean crane hanging big red car, close to the "happy" word pulled "Congratulations to the bride and groom Love For All Seasons," "Congratulations to the bride and groom hundred head cried," and other words of banners, pocketed the eye on the street. This battle is really a large enough shock, keep them coming back on the road to open not less than a luxury car.

The convoy of four vehicles consisting of a crane. Jiang Jian Xie said the groom, the wedding car which used two cranes is all his, and the other two by a friend. Around 900,000 per value, in this way to marry the bride, better than Mercedes, BMW plunges, but more and more domineering pull the wind.
I was thinking, what I'm going after the bride? You help me out of ideas, right?