SPALLED CONCRETE DRIVEWAY - FIXING SPALLING ISSUES

What caused this surface failure on my integrally colored concrete driveway, and what can I do to repair it? The driveway is 6 years old and 1,000 square feet in size, but only a few hundred square feet directly in front of the garage doors show signs of failure.

This type of surface failure, known as spalling or scaling, is more common in colder climates where freeze-thaw cycles and deicing chemicals are prevalent. Freezing causes the water in the capillaries of the concrete to expand, creating pressure. Over time, the expansive pressure from repeated cycles of freezing and thawing can break away the top surface of the concrete machinery, leaving pit marks and exposing the coarse aggregate. Deicing chemicals only aggravate the already-stressed concrete by allowing more water to migrate into the concrete, thus increasing the size and depth of the spalling failures when a freeze occurs. That's why the problem occurred only in front of the garage, where the cars are often parked. Deicing chemicals picked up from the road dripped onto the surface, allowing water to permeate that area.
On new concrete, you can dramatically reduce water-induced spalling by applying a penetrating waterproofing sealer 28 days after concrete placement and every few years thereafter. To address the problem after it has occurred requires covering the entire affected area with a polymer-modified cementitious overlay in a color matching the existing driveway. Once the overlay cures, apply a waterproofing sealer to prevent the problem from reoccurring.

2015年8月10日星期一

How to Mix Concrete in a Mixer

A portable concrete mixer provides an economical solution for do-it-yourself concrete projects. A mixer eliminates the need for backbreaking manual labor to mix up small batches of concrete. Both electric and gasoline-fueled mixers may be rented out by the hour or day. The equipment can be rolled right on site to build the slab for a garden shed or walkway

Instructions

  1. Roll the cement mixer onto level ground near the place the finished concrete will be spread. Lock the wheel brakes. Extend and lock the stabilizing legs (if the mixer has them) into place.
  2. Tip the barrel to the 45 degree up-angled position. Click the position lock into place.
  3. Dump bagged cement mix into the mixer barrel. Use one bag at a time unless otherwise permitted by the specific mixer instruction sheet. Add sand to the mixer barrel in the proportion listed on the cement bag.
  4. Plug the heavy-duty three-pronged electrical extension cord into the mixer plug receptacle. Plug the other end of the cord into a live electrical outlet. For gasoline-powered mixers, fill the mixer tank with gas and twist the gas cap tightly closed.
  5. Turn the mixer on to the lowest setting. Allow it to run until the sand and cement are well combined. Turn the mixer speed up to a medium setting. Pour in the volume of water indicated on the cement bag label. Use a bucket to add the water in a steady stream as the mixer continues turning.
  6. Switch the mixer off when all ingredients are completely combined. The mix should be slightly soupy without any dry clumps. Release the barrel lock and tip the concrete out into a wheelbarrow.
  7. Clean the mixer immediately before concrete can harden on its surfaces. Unplug the equipment and then hose it off with a strong stream of water.


2015年7月26日星期日

How to Build a Deer Hoist

Processing deer is a somewhat messy job and the best way to do the job right is to hang the animal. You can purchase commercial hoists but they are expensive. Building your own hoist will save you money and you can custom fit it to the location in which you prefer to use it. A portable hoist that can be used in the field is a common device that can be assembled quickly and used just about anywhere.
Instructions

Check your winch for the specifications of the cable it uses. You will need a minimum of 25 feet of cable as you are going to lift the deer over an available tree limb. A typical manual winch can lift approximately ½ ton with 5/32-diameter steel cable, which is more than enough to hoist your deer over a tree limb.
Make a small loop in one end of the cable. Insert a cable clamp around the end and the cable where the loop begins. Tighten the clamp with the pliers.
Wind the cable tightly on the winch so the tension stays consistent. Winch cables come pre-attached and wound; however, after use it is important to rewind the cable carefully to avoid slack in the line, which can jerk the deer right off the gambrel.
Hang the cable over a high tree limb or other bar-type structure out in the field to building hoist the deer. Attach your gambrel to the end of the cable once it has been hung over the limb. A gambrel is a triangular-shaped device with a spreader bar in the center and two hooks or prongs at either end of it to attach a deer’s legs. The top bars of the gambrel are usually either flexible strapping, cable or solid bars that come to a point for hanging. Attach the gambrel to the cable with an S-hook.
Hoist the deer using the electric or hand winch by cranking it once the deer has been secured to the gambrel. Lift the deer to a comfortable height to work on field dressing it.

2015年7月19日星期日

Frequency buliding hoist FAQ

1. The building hoist is one of the major high-rise construction crane equipment most commonly used in building construction, the construction site is a major hazard in security checks and safety management as a key should be the focus. Past accidents and bloody lesson is profound, only in October 2008 - November, on a spate of domestic building hoist 2 from major accidents, killing 12 people and 18 people were killed and direct and indirect losses exception huge, huge irreparable damage to multiple families. In recent years, construction accidents tended to increase gradually beyond the coal industry, in addition to a traffic accident become the second largest security incidents outside the industry. Strict inspection, scientific management, prevention is the construction site construction crane safety management key, we need serious discussion and analysis.

2 construction lifts Checkpoints
    2.1 Part-site inspection entity
    2.1.1 base, base, fence
    ⑴ check whether basic parts of water, if there is evidence of uneven or sink.
    ⑵ mounted on one floor of the elevator, you must check the basement roof support systems and computing programs and inspection data base (including covert acceptance).
    ⑶ check the base, fence grounding system meets the requirements, whether the grounding resistance less than or equal 4Ω.
    ⑷ cage and the counterweight buffer (spring) is complete and effective.
    ⑸ pick tight end of the cage surrounding undamaged and height of not less than 1.8m.With the development of science and technology, frequency control in building hoist to get more and more widely used. Frequency has a smooth start and stop the process, reduce the mechanical impact and increase occupant comfort, improve service life, but also can adjust the speed by varying the frequency of power supply, save energy, improve efficiency, but in the course of Frequency Control System It will be interference, often caused by building hoist accidents happen.building hoist inverter system circuit consists of two parts of the main circuit and control circuit. The main circuit consists of two parts rectifier, inverter circuit; a control circuit consists of a microprocessor, PAW trigger, PWM current controller and current feedback and other components.
 Sources of interference building hoist building hoist inverter circuit block diagram of frequency control system are: overvoltage, undervoltage, instantaneous power failure inductive interference; inductive interference surge currents; inductive interference peak voltage pulse; when the weather since fog inductive interference sense currents; radio signal interference.
building hoist inverter system after interference can cause your system is running out of control, causing the motor is running faster or slower, running up and down the cage unstable speed; the control malfunction occurs stop button and emergency stop button does not work, the motor can not stop such phenomena may cause loss of control or by falling building hoist, causing accidents.

2015年7月16日星期四

What Are the Dangers of Working in a Concrete-Based Plant?

Employees who work with concrete are subject to dangers from exposure to the material. While the extent of the danger related to the concrete is significant in jobs such as construction, the highest risk to concrete-specific hazards is within the facilities that manufacture the concrete, according to the IOP Science website. Knowing the potential risks associated with working in a concrete-based plant can help workers prepare for the job and minimize the dangers of working there.
 

Inhalation Dangers

  • People who work in a concrete machinery setting are constantly exposed to the dust from the dried raw materials. Those who sweep and clean are especially susceptible to inhalation hazards. Portland cement is a common material used to make concrete, and the dust from the dried cement has been labeled a possible cancer risk, according to the IOP Science website.
    Inhaling this dust is suspected to increase risk of several cancers, including pharyngeal carcinoma and gastric cancer. Inhaling this material is also known to cause nose and throat irritation and respiratory difficulties. Exposure to crystalline silica dust, another concrete raw material, can lead to a serious lung disease called silicosis, according to the State Compensation Insurance Fund website.

Skin Contact

  • While working with and mixing concrete in a plant, workers are likely to expose their skin to wet concrete from time to time. As long as the substance is washed off immediately, irritation is unlikely. However, extended contact with the skin will cause concrete to burn the skin because of the alkaline nature of the mixture. These burns can range from first- to third-degree, and skin ulcers may result if the substance is in contact with the skin for long periods.
    Even with protective clothing, workers may get bits of concrete trapped inside boots or have it soak through layers of clothing, according to the Electronic Library of Construction Occupational Safety and Health. This risk is the same for both concrete batching plant workers and construction workers dealing with concrete.

Eye Injury

  • The same dust that can cause lung problems when inhaled can also do damage to the worker’s eyes. Depending on the amount of dust that enters the eyes and the duration before they are rinsed clean with water, the effects can range from minor eye irritation and redness to chemical burns on the eyeballs, according to the State Compensation Insurance Fund website.

Allergies

  • Some workers who are in the presence of cement regularly develop an allergy (or occupational asthma) to the hexavalent chromium in the product. This asthma-like allergy causes breathing difficulty and wheezing. Chromium allergies may also lead to skin rash or skin ulcers, according to the Electronic Library of Construction Occupational Safety and Health website.

2015年7月15日星期三

How to Erect a Tower Crane

Tower cranes are used on construction sites to move materials from low to high places, and vice versa. They are used for high-rise structures, in areas where a wheel-mounted crane is not large enough to carry out the work. Erecting a tower crane should only be carried out by trained professionals; if you try to raise it yourself with little or no experience, you run a high risk of collapse, leading to extensive loss and damage.

Instructions

  1. Use an excavator to dig a pit for the crane base, and fill it with concrete. Set steel anchors into the concrete, which will attach to the first section of the crane's mast. Leave the concrete machinery to cure for 24 hours.
  2. Attach the first section of mast securely to the anchors using bolts. Use your spirit level to ensure that the mast is vertical.
  3. Fix another section of mast to the first using bolts, and continue to do so until you have reached your desired height. You will need a scissor lift or telescopic boom to carry out this step.
  4. Assemble the horizontal sections -- also known as the jibs -- to the mast. These hold the chains for lifting materials on one side, and the counterweights on the other, to prevent the crane from toppling over. These horizontal jibs should be securely fixed using steel bolts.
  5. Load the crane to full capacity to check it has been assembled correctly.

2015年7月12日星期日

Tower crane market forecast analysis into the electricity business era

As China's large-scale infrastructure construction continue to be launched, as well as expand the construction of cities and towns around the tower crane to the construction way it has brought great convenience, China tower crane market outlook uncertain, the long-term bullish. In addition, the electricity supplier to enter the tower crane has become the industry trend.

China's current production of tower crane, construction machinery will not only meet the domestic demand, but also exported to Europe and other developed countries and regions, China has become the world's largest producer of the tower crane. Public information, in 2002 China became the world's first tower annual production exceeded 1 million units in the country, and by 2010, China's tower crane production reached nearly 40,000 (including export 2,000 units).
These are no doubt good news for e-commerce journey tower crane.
Due to changes in the market, in order to meet our customers enjoy in the purchase process tower more professional, comprehensive services, many large domestic enterprises began to aim the tower crane electricity supplier, and tasted the sweetness. In fact, not all tower crane manufacturers have shared electricity supplier cake. Like the small tower pressure by funding and personnel, inability their operating platforms, but if the use of network marketing, especially with mature business platform, is relatively simple.
Tower cranes enterprises to enter the field of electronic commerce are generally divided into three ways, first it is to create their own e-commerce platform, this approach requires initial investment capital and technical requirements are very high; the second is the use of e-commerce platform, enterprise to establish their own operations and maintenance teams, this mode is advantageous in that position can quickly bring a commercial return, but requires operators of high-quality personnel; third is looking for an agent operators, traditional enterprise and agency operators benefit-sharing agreement reached . As can be seen, the third model the desired small cost, the threshold is low, more suitable for SMEs.
However, even in cooperation with the proxy operators, multi-mode e-commerce platform also enable SMEs dilemma.
At present, many domestic small and medium enterprises in the use of B2B platform, has formed a limitation of consciousness, only concerned with Alibaba and other large e-commerce site, however, was found in the presence of orders did not increase, some companies even therefore lost confidence in e-commerce.
Looking at the domestic suppliers industry, mechanical and electrical tower, according to online trading platform pay-lifting equipment factory store only one.
Many B2B platform with membership, regardless of whether there are orders, the annual membership fee is there, the manufacturers bear a great deal of risk.
Lifting Equipment Factory Store model is a single before does not charge any fees, so-called pay-per-effects, the transaction is not successful, do not charge a penny. Simply publishing companies supply information on the platform, the factory shop will spare no effort to promote, resolve inquiries, order problems, and ultimately by the enterprise to decide whether to trade. Did not come alone, the firm is not to spend a penny.
Coupled free to enter, exclusive service, lifting equipment factory shop online brand is simply business Direct center. Many manufacturers have successfully settled tower crane lifting equipment factory stores, will lead the tower crane industry into the era of the electricity supplier.