First, before starting to deal with the various parts of the mixer mixer various mechanical systems carefully check to make sure only after a good start concrete mixer truck.
Second, before starting concrete mixers, concrete mixer should stir the lever on the “neutral” position.
Third, the mixer start, it should be stirred joystick on the “unloading” position, put the barrel to the stirred water.
Fourth, mixer loading, stirring the operating lever should be placed “charge” position.
Five concrete mixer before shipping, mixer discharge chute must be fixed in the “drive” position, to prevent mixer discharge chute swing does not occur.
Six cement mixer when operating the joystick, should be in the “neutral” position stopover before moving to the next position.
Seven, do a good job of civilization construction, are not allowed to casually Dumping excess material barrel. It must be mixing tube, chute, roller and other parts for cleaning after discharge.
Eight, when people enter the barrel to clear concrete lumps, should turn off the vehicle, disconnect switches keys, cylinder peripheral guardianship.
没有评论:
发表评论