2015年9月13日星期日

Compulsory concrete mixer before starting aggregate screening mixing blade adjustment and the whole machine routine maintenance work

Forced concrete mixer before the repair work still needs to pay attention to the power aggregate and a stirring blade after finishing


Compulsory concrete mixer is often used in modern large-scale projects, do a variety of concrete batching plant mixing console, you can do stabilized soil concrete batching plant mixing host. Compulsory mixer into a single horizontal shaft forced concrete mixers and twin-shaft compulsory concrete mixer, high mixing efficiency, stir, good quality teaching version, discharge speed, small stirring blade linear velocity, good wear resistance and less energy consumption. To ensure the normal operation of compulsory concrete mixer, power needs to pay attention to the following points after the inspection work is done:
(1) for concrete aggregate should be a rigorous screening, the maximum particle size must not exceed the allowable value, in case the card material. Join material mixing tube stirring each time, shall not exceed the specified feed capacity, in order to avoid power overload.
(2) stirring and mixing tube gap bottom and side walls of the blade should always check for compliance with regulatory requirements. When the gap exceeds the standard, make the cylinder wall and the cylinder bottom bonded residual material layer is too thick, increase cleaning difficult and reduce mixing efficiency, such as stirring blade wear, should adjust, repair or replacement.

没有评论:

发表评论