Instructions
- Use an excavator to dig a pit for the crane base, and fill it with concrete. Set steel anchors into the concrete, which will attach to the first section of the crane's mast. Leave the concrete machinery to cure for 24 hours.
- Attach the first section of mast securely to the anchors using bolts. Use your spirit level to ensure that the mast is vertical.
- Fix another section of mast to the first using bolts, and continue to do so until you have reached your desired height. You will need a scissor lift or telescopic boom to carry out this step.
- Assemble the horizontal sections -- also known as the jibs -- to the mast. These hold the chains for lifting materials on one side, and the counterweights on the other, to prevent the crane from toppling over. These horizontal jibs should be securely fixed using steel bolts.
- Load the crane to full capacity to check it has been assembled correctly.